India has achieved a massive milestone in urban transportation! For the first time in the country’s history, an underwater metro train successfully completed its journey beneath the Hooghly River. This historic trial marks a significant leap for the East-West Metro Corridor project, bringing world-class infrastructure to Kolkata.
Key Highlights of the Underwater Metro Trial
The recent trial run has set the stage for a new era of commuting. Here are the essential details:
- The Route: The train traveled from Howrah Maidan to Esplanade.
- The Crossing: The Hooghly River section was crossed in approximately 11.55 minutes during the trial.
- Leadership: Metro General Manager P. Udayakumar Reddy was present for the historic event and was welcomed with a traditional ceremony at Howrah station.
- The Fleet: Rack number MR 613 was used to conduct this successful run.
Engineering Marvel: Comparing India to London and Paris
India’s first underwater metro is being compared to international icons like the Eurostar, which connects London and Paris.
- Depth: The tunnel is situated 13 meters below the riverbed and 32 meters below the water level.
- Speed: Once commercial services begin, the train is expected to cover a 520-meter distance under the river in just 45 seconds.
- Deepest Station: Upon completion, Howrah will become the deepest metro station in India at 33 meters, surpassing the current deepest station, Hauz Khas (29 meters).
- Safety First: To prevent water seepage, engineers used a specialized concrete mixture of micro-silica and fly ash.
Under Water Metro Train Video
Timeline and Future Plans
- Extended Trials: Trial runs between Howrah Maidan and Esplanade are scheduled to continue for the next 7 months to ensure complete safety and efficiency.
- Completion Date: Sources suggest the project is aimed for completion by December 2023.
- Innovative Power: While trains will run normally in the future, a specific section from Sealdah to Esplanade will utilize battery power for public relay during the transition phase.
Quick Facts: India’s Metro Legacy
| Milestone | Details |
| First Metro in India | Started in Kolkata, 1984 |
| Delhi Metro Launch | Started in 2002 |
| Construction Cost | Approximately Rs 120 crore per kilometer for the tunnel |
| Water Metro (Above Water) | Kerala will launch Asia’s first metro train running on water |
Important Link’s
| વધુ માહતી માટે | અહીં ક્લીક કરો |
| whatsapp ગ્રુપ માં જોડાવા માટે | અહીં ક્લીક કરો |
Frequently Asked Questions (FAQs)
Q: Where was India’s first Underwater Metro Train run?
A: It was run under the Hooghly River in Kolkata.
Q: By when will the project be fully completed?
A: The project is expected to be completed by December 2023.
Q: Which state is launching a metro that runs on the water?
A: Kerala is set to start Asia’s first above-water metro service.